Sarah Xenophon, Project Manager
TeamAg Inc.
570-294-5229
sarahx@teamaginc.com
Practice Implementation List:
Roofed Stacking Structure (PA-313)
Waste Storage Structure (PA-313)
Waste Storage Structure(PA-561)
Heavy Use Area Protection(PA-561)
Roof and Covers (PA-367)
Waste Transfer (PA-634)
Pumping Plant (PA-533)
Access Road(PA-560)
Trails and Walkways (PA-575)
Fence (PA-382)
Critical Area Planting (PA-342)
Roof Runoff Structure (PA-558)
Lined Waterway or Outlet (PA-468)
Structure for Water Control (PA-587)
Subsurface Drain (PA-606)
Underground Outlets (PA-620)
Obstruction Removal (PA-500)
Riparian Forest Buffer (PA-391)
Stream Crossing (PA-578)
All work to be done in accordance with the Pennsylvania Technical Guide (PATG) NRCS standards and construction specifications.
Mandatory Pre-bid Site Showing: May 14th, 9am at 549 Beaver Dam Rd, PA 19344
Bids Due: May 29th, by 4:00pm
Bid Opening Date/Time: May 31st, 10am – 120 Lake Street, Ephrata, PA 17901
Construction: expected to be completed by 9/25/25
This project requires the use of Prevailing Wages. Please find the prevailing wage determination for this project linked below.
https://www.dlisecureweb.pa.gov/PrevWage/Pages/Project.aspx?ID=182707&PageType=