Joe Walker Bid - TeamAg Inc
17310
page-template,page-template-full_width,page-template-full_width-php,page,page-id-17310,ajax_fade,page_not_loaded,,qode-theme-ver-13.1.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.4.5,vc_responsive
 

Joe Walker Bid

Project Details

Primary Contact

Sarah Xenophon, Project Manager

TeamAg Inc.

570-294-5229

sarahx@teamaginc.com

Scope of Work

The proposed project includes numerous Best Management Practices (BMPs) to address the resource concerns and improve water quality. The existing liquid manure storage on the farm is very limited; to be addressed with one new circular concrete manure storage structure (16’x80’) and associated manure transfer components (PTO pump, pressure manure transfer pipe, etc.). Select areas of existing field lane and silage pad are to be resurfaced and stabilized with gravel and/or asphalt millings. A new roofed heavy use area and manure stacking building (48’x72’ total) will provide a stabilized feeding and resting area for heifers and an area for storage of solid manure from heifers, dry cows, and calves through the winter months. Extension of the existing gutter cleaner and related equipment will allow conveyance of solid manure from the bank barn to the manure stacking area. New gravel animal walkways will be installed to provide a stabilized path from the roofed HUA to pasture. Waterways, culverts, and conveyor belt diversions are planned to address clean runoff upslope of and from the primary BMPs.

All work to be done in accordance with the Pennsylvania Technical Guide (PATG) NRCS standards and construction specifications.

Site Photos

Quantities

Bid & Contracting Requirements

Schedule

Pre-bid Site Showing: June 15th, 10am – 203 Berkleys Mill Rd, Meyersdale, PA 15552

Bids Due: June 29th, by 4:00pm 

Bid Opening Date/Time: July 5th, 10am – 120 Lake Street, Ephrata, PA 17901

Construction: expected to be completed by 9/1/24

Wage Requirements

This project requires the use of Prevailing Wages. Please find the prevailing wage determination for this project linked below.

https://www.dlisecureweb.pa.gov/PrevWage/Pages/Project.aspx?ID=173364&PageType=

Contracting Details

  1. General contractors must attend the pre-bid meeting and return completed response forms and quantity sheets by the due date in order to qualify as a responsible bidder.
  2. Prior to signing contracts, successful contractors will be required to provide the following:
    1. Certificate of insurance based on the services or product provided
    2. Proof of registration with the Commonwealth of Pennsylvania
    3. Performance and Payment Bonds
  3. TeamAg, Inc. will manage the construction of the project and perform inspections during construction to ensure that construction is done in accordance with the drawings and specifications.
  4. Contractors are to provide invoices and Prevailing Wage reports ( LLC-25) to TeamAg, Inc. on a monthly basis.  Construction is expected to start within 90 days of the contract being awarded. Construction is expected to be completed by 9/1/24.
  5. All subcontractors engaged by primary contractors must follow all the provisions of primary contractors.
  6. Upon completion of the contracted work, contractors shall sign a Certification of Performance that all work was performed according to the design drawings, specifications, and the Pennsylvania Technical Guide.