Sarah Xenophon, Project Manager
570-294-5229 or sarahx@teamaginc.com
Adam Keller, PE, Engineer of Record
717-371-0108 or adamk@teamaginc.com
Practice Implementation List:
Waste Storage Facility (313), 2 EA
Waste Transfer (635), 150 LF
Stream Crossing (578), 2 EA
Underground Outlet (620), 382 LF
Heavy Use Area (561), 10400 SF
Roof Runoff Structure (558), 400 LF
Fence (382), 8700 LF
Roofs and Covers (367), 10400 SF
Waste Facility Closure (360), 1 EA
All work to be done in accordance with the Pennsylvania Technical Guide (PATG) NRCS standards and construction specifications.
Pre-bid Site Showing: October 22nd, 9am at 347 Shirktown Rd, Narvon, PA 17555
Bids Due: November 5th, by 4:00pmĀ
Bid Opening Date/Time: November 7th, 10am – online and at 120 Lake Street, Ephrata, PA 17901
This project requires the use of Prevailing Wages. Please find the prevailing wage determination for this project linked below.
https://www.dlisecureweb.pa.gov/PrevWage/Pages/Project.aspx?ID=187518&PageType=